R6 — Railway journey model

Status: Wave 1 research recommendation
Repos: tunes (canonical schema + London instance data); consumed by tunes-ios (journey UX) and tunes-web (map, alignment, releases)
Must-read inputs: project-charter.md, scope-statement.md, acoustic-survey-methodology.md, 01-assumptions-and-open-questions.md


1. Decision questions

  1. Should the core schema use Tube-specific types or generic railway concepts?
  2. Is station-to-station the right canonical public comparison unit?
  3. How do we stay London-first without baking London terminology into the core model?

Working assumptions this doc tests and largely confirms:

  • Canonical unit = section (station-to-station) with explicit duration
  • London-first portable schema: pilot on London; core model stays generic
  • Dense coverage over shallow network-wide scrape

2. Design principle: London as instance, not ontology

Recommendation: Core entities are generic. London Underground, Elizabeth line, Overground, and National Rail services appear as instances (systems, operators, lines, stock) under that schema.

Do not make TubeLine, Zone, or UndergroundStation the root types of the model. London-specific labels, branding, and operational quirks belong in:

  • Instance data files / network definitions owned by tunes
  • Optional profile modules (e.g. profiles/london.yaml)
  • Display strings in tunes-web / tunes-ios

ADR-002 accepts this answer to brief question #2: generic core; London as profile. It also keeps later cities from forking the schema.

Independence reminder: using publicly available network facts or open transport data does not imply TfL operation, approval, or endorsement.


3. Generic railway schema (conceptual)

The following is a decision-oriented conceptual model for Phase 1 JSON examples — not a frozen DDL.

3.1 Geography and governance

EntityRoleNotes
CityPilot geography containere.g. London; future cities add rows, not new core types
Transport systemNamed network the passenger recognisese.g. “London Underground”, “National Rail (London terminal approaches)”
OperatorOrganisation running servicesMay differ from system brand; multiple operators per system possible

3.2 Network structure

EntityRoleNotes
LineNamed passenger-facing route identityGeneric; not subclassed as Tube-only
BranchDivergence within a lineEssential for Northern, District, etc.; same type elsewhere
DirectionTravel orientation on a line/branchPrefer stable IDs + localised labels (eastbound/westbound are labels)
StationStop with stable IDShareable across systems where physically shared
PlatformBoarding face at a stationOptional for v1 map; valuable for research metadata later
SectionDirected interval between consecutive stationsCanonical comparison unit — see §4
Track / running directionPhysical sense if knownOptional; do not require for crowd contributions

3.3 Service and vehicle

EntityRoleNotes
Service / tripA particular run (timetabled or observed)Links planned vs actual timing
Rolling stock / train typeVehicle classe.g. 1992 Tube Stock as instance data — methodology reference context, not a core type name
Unit / set IDSpecific train identityRare for passengers; optional research field
CarriageCar within the unitIndex or label if known
Carriage position (train)Front / middle / rear (approx.)Passenger-friendly enum for R8
Position within carriageEnd / centre / doors / bogie (approx.)Optional; affects acoustics
Passenger postureSitting / standingAligns with professional height rationale (1.2 m / 1.6 m) without requiring exact height

3.4 Timing

Field groupRole
Planned timingTimetable expectations for boundary hints (R7)
Actual timingObserved section T, dwell, holds
DisruptionsHeld between stations, skipped stops, partial journeys
Express / skip-stopSection topology may differ from “all stops” lines

3.5 Measurement attachment

Acoustic observations attach primarily to:

  1. Section (required for public comparison)
  2. Duration T for that section (required with any Leq)
  3. Optional: service/trip, stock, carriage position, posture, device/calibration (R4), perception report (R9, separate)

Platforms, exact unit IDs, and fine track models enrich research but must not block ordinary contributions.


4. Canonical unit: station-to-station section

4.1 Why this unit

Professional interior surveys report per station-to-station leg with transit duration (methodology notes §1.5; ISO 3381 context for in-vehicle measurement). That practice transfers cleanly to a public map:

  • Passengers already think in stops
  • Sections compose into journeys
  • Duration T makes LAeq interpretable
  • Bidirectional reporting stays natural (A→B ≠ B→A)

Glossary alignment: section = directed interval between consecutive stations, with duration.

4.2 Test the assumption (do not freeze blindly)

Treat section-as-canonical as a working decision to validate, not dogma. Pilot / prototype tests should check:

TestPass signalFail / revise signal
Map usefulnessUsers can compare alternate paths by sectionsUsers only care about whole-line averages
Alignment UX (R7)Boundaries editable as section chaptersUsers cannot reliably assign sections
Sparse dataSection aggregation still honest with sample countsForced section stats fabricate precision
Holds / stallsExclusions or flagged sub-intervals work (cf. methodology deviation disclosure)Section Leq polluted without remedy
Shared tracks / complex junctionsSection IDs remain stableConstant redefinition / ambiguity

Recommendation: Keep section canonical for public comparison through the London pilot unless tests falsify it; any change requires an ADR. Allow additional aggregates (whole line, station ambient) as secondary layers later — not replacements.

4.3 What a section record must carry

Minimum for a public comparison cell:

  • from_station_id, to_station_id
  • line_id (+ branch_id when ambiguous)
  • direction_id
  • duration_T for the measurement interval used
  • Metric fields with weighting (never mix)
  • Provenance: device/calibration/processing version/quality tier
  • Uncertainty / sample-count display hooks for tunes-web

Optional but valuable: stock, carriage position, load, time-of-day bucket, disruption flags.

4.4 Non-section intervals

Recordings will include walking, platform waits, transfers, and mid-section holds. Model these as:

  • Non-revenue / non-section intervals trimable in review (R5 step 5), or
  • Explicitly flagged exclusions (methodology: disclose deviations)

Do not silently average platform noise into a moving-section Leq.


5. London profile (instance sketch)

Illustrative only — not a completeness claim:

Generic entityLondon examples (instances)
CityLondon
SystemsLondon Underground; London Overground; Elizabeth line; National Rail (as scoped)
OperatorsInstance rows as applicable — not an endorsement relationship
Lines / branchesCentral, Jubilee, Victoria, Northern (with branches), etc.
SectionsStratford→Leyton style directed pairs (example pattern from methodology notes)
Rolling stockStock classes as data, e.g. historic 1992 Tube Stock references in external FOI methodology — not copied proprietary tables

Scope decision #1 (network breadth)

Schema portability does not force Underground-only or all-London-rail at launch. Breadth is a pilot-capacity and UX decision:

  • Schema: ready for multiple London systems
  • Launch content: may still be Underground-priority

Document the launch cut in an ADR when stakeholder/pilot capacity decides.


6. Identity, stability, and open data

ConcernGuidance
Stable IDsPrefer opaque stable IDs + human names as labels; names change, IDs should not
Shared stationsOne station entity may participate in multiple systems/lines
Section identityDirected pair + line/branch; document how multi-path corridors are disambiguated
External referencesOptional links to open dataset stop IDs where licences allow — operational data ≠ endorsement
VersioningNetwork definition versions sit beside measurement releases (R10) so old sections remain interpretable

7. Interaction with alignment and metadata (boundaries)

This model intentionally stops where R7/R8 begin:

  • R7 consumes section topology to propose boundaries; users correct them.
  • R8 decides which of stock / carriage / posture fields are required vs optional.
  • R4 attaches calibration_state to the measurement, not to the network entity.
  • R5 ensures section assignment is reviewable before upload (wrong section is a privacy and science defect).

Crowd measurements remain survey-grade at best even when section IDs are perfect.


8. Repo implications

ArtefactOwner
Generic schema docs + JSON examples + London instance definitionstunes
Line/branch/section pickers, correction timeline bound to sectionstunes-ios
Map geometries keyed by section IDs; aggregation queriestunes-web

Recommendation

  1. Adopt a generic railway core (city, system, operator, line, branch, direction, station, platform, section, stock, carriage position, timing).
  2. Represent London as instance/profile data, not Tube-specific core types.
  3. Treat station-to-station sections with duration as the canonical public comparison unit; test in alignment and map prototypes; change only via ADR if falsified.
  4. Keep platform waits, walks, and holds out of section Leq unless explicitly modelled/excluded.
  5. Separate launch network breadth (Underground-only vs wider London rail) from schema portability — schema stays ready either way.
  6. Version network definitions with dataset releases for reproducibility.

Confidence: High for generic-vs-Tube and section-as-default canonical unit; Medium for platform/stock field requirements and exact multi-path ID rules until R7/R8 prototypes; Medium for launch network breadth pending stakeholder/pilot capacity.

Depends on experiment/legal/user-test? Yes — user-test section comparison UX and metadata friction; prototype tests for alignment on branched lines and holds; legal only where external stop-ID datasets and licences are imported; no experiment blocks adopting the generic schema vocabulary now.

Links to related docs: